![]() ☐ Confirm with facility owner vacuum or hydro excavation is scheduled for all pipelines impacted ☐ Review safety information with anyone working the job Note location, height, and operator of overhead lines.Permanent signage and location relative to the dig area: Locate marks and flags from 360° at varying distances for perspective All facilities are marked within the excavation area One Call ticket “Work to Begin” date is valid One Call ticket covers the scope of the work ☐ Compare actual jobsite to One Call ticket ☐ Talk with the property owner or general contractor to identify potential private facilities that may not be marked: ☐ Look for evidence of trench lines from previous excavation ☐ Identify all services to buildings such as: ☐ Consult any maps or field sketches of the location ☐ Other surface signage for landscaped areas Pavement markers (stamped nails, pavement decals, A-tags™) ![]() ☐ Onsite meeting scheduled with all high profile facilities in locate area (gas/ oil pipelines, high-voltage cables, fiber optic)Ĭomplete a pre-excavation walkthrough of the entire jobsite and adjacent areas ☐ Locate ticket number is posted at the work location ☐ Call 811 at least 2-3 business days before excavation (check your state One Call laws) ☐ Proposed excavation area has been marked in white paint and/or flags ☐ Review all drawings, plans, engineering blueprints for existing buried facilities Dp-PRO - dp-PRO_SpLoc_2019 Pre-Excavation Checklist Before EVERY Excavation
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |